M8 Cable Assemblies

Results: 906
Select Image Part # Mfr. Description Datasheet Availability Pricing (SGD) Filter the results in the table by unit price based on your quantity. Qty. RoHS Connector End A Connector End A Pin Count Connector End B Connector End B Pin Count Cable Length Voltage Rating
Lumberg Automation Sensor Cables / Actuator Cables Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

M12 4 Position M8 4 Position 300 mm (11.811 in) 36 V
Lumberg Automation Sensor Cables / Actuator Cables Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 600 mm (23.622 in) 63 V
Lumberg Automation Sensor Cables / Actuator Cables Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 1 m (3.281 ft) 32 V
Lumberg Automation Sensor Cables / Actuator Cables Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 2 m (6.562 ft) 32 V
Lumberg Automation Sensor Cables / Actuator Cables Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 3 m (9.843 ft) 32 V
HARTING Sensor Cables / Actuator Cables M8 MALE STR 3POL. WITHOUT LED 0,3M Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 60 V
HARTING Sensor Cables / Actuator Cables M8 ML STR 3POL W/O LED .6M Non-Stocked Lead-Time 9 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 60 V
HARTING Sensor Cables / Actuator Cables M8 STI GER.3POL. MIT LED 0,3M Non-Stocked Lead-Time 9 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 60 V
HARTING Sensor Cables / Actuator Cables M8 STI GER.3POL. MIT LED .6M Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 60 V
HARTING Sensor Cables / Actuator Cables M8 STI GER.3POL.MIT LED 1.0M Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 60 V
HARTING Sensor Cables / Actuator Cables M8 STI GER.3POL. MIT LED 1,5M Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 60 V
HARTING Sensor Cables / Actuator Cables M8 STI GER.3POL. MIT LED 2,0M Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 60 V
HARTING Sensor Cables / Actuator Cables M8 A-code Double Ended Overmolded Cable Assembly, 4pin, straight male to straight female, PUR Black, 0.3m Non-Stocked Lead-Time 9 Weeks
Min.: 1
Mult.: 1
M8 4 Position M8 4 Position 300 mm (11.811 in) 30 V
HARTING Sensor Cables / Actuator Cables M8 A-code Double Ended Overmolded Cable Assembly, 3pin, angled male to straight female, PUR Black, 3.0m Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1
M8, Right Angle 3 Position M8 3 Position 3 m (9.843 ft)
Phoenix Contact Sensor Cables / Actuator Cables SAC3PM8MS/3,0680 M8FS Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 3 m (9.843 ft) 48 VAC, 60 VDC
Phoenix Contact Sensor Cables / Actuator Cables SAC3PM8MS/40,0680 M8FS Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 40 m (131.234 ft) 48 VAC, 60 VDC
Phoenix Contact Sensor Cables / Actuator Cables SAC3PM8MS/1,5680 M8FS Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 1.5 m (4.921 ft) 48 VAC, 60 VDC
Phoenix Contact Sensor Cables / Actuator Cables SAC3PM8MS/0,5680 M8FS Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 500 mm (19.685 in) 48 VAC, 60 VDC
Phoenix Contact Sensor Cables / Actuator Cables SAC4PM8MS/15,0680 M8FS Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M8 4 Position M8 4 Position 15 m (49.213 ft) 48 VAC, 60 VDC
Phoenix Contact Sensor Cables / Actuator Cables SAC4PM8MS/40,0680 M8FS Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M8 4 Position M8 4 Position 40 m (131.234 ft) 48 VAC, 60 VDC
Phoenix Contact Sensor Cables / Actuator Cables SAC3PM8MS/5,0680 M8FS Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M8 3 Position M8 3 Position 5 m (16.404 ft) 48 VAC, 60 VDC
Phoenix Contact Sensor Cables / Actuator Cables SAC-4P-MS/1.5-542/ M8FSSH SCOBK Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M12 4 Position M8 4 Position 1.5 m (4.921 ft) 48 VAC, 60 VDC
Phoenix Contact Sensor Cables / Actuator Cables SAC-4P-MS/0.5-542/ M8FSSH SCOBK Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M12 4 Position M8 4 Position 500 mm (19.685 in) 48 VAC, 60 VDC
Phoenix Contact Sensor Cables / Actuator Cables SAC-4P-MR/1.5-542/ M8FSSH SCOBK Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M12 4 Position M8 4 Position 1.5 m (4.921 ft) 48 VAC, 60 VDC
Phoenix Contact Sensor Cables / Actuator Cables SAC-4P-MR/0.5-542/ M8FSSH SCOBK Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

M12 4 Position M8 4 Position 500 mm (19.685 in) 48 VAC, 60 VDC