10 m Wire & Cable

Results: 1,458
Select Image Part # Mfr. Description Datasheet Availability Pricing (SGD) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Amphenol LTW Specialised Cables NMEA 2000, T Cable, Metal, 8A, 05 pins, Screw Thread, (End 1) Female Female, (End 2) Male Male, Length 10000mm, IP68 Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1

Amphenol LTW Specialised Cables NMEA 2000, T Cable, Plastic, 4A, 05 pins, Screw Thread, (End 1) Female Female, (End 2) Female Female, Length 10000mm, IP68 Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1

Amphenol LTW Specialised Cables NMEA 2000, T Cable, Plastic, 4A, 05 pins, Screw Thread, (End 1) Female Female, (End 2) Male Male, Length 10000mm, IP68 Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1

Amphenol LTW Sensor Junction Blocks NMEA 2000, Distribution Box, Metal, 4A, 05 pins, Screw Thread, Length 10000mm, IP68 Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1

Stewart Connector Fibre Optic Cable Assemblies MPO Female OM3 50/125 10M Non-Stocked Lead-Time 4 Weeks
Min.: 25
Mult.: 25

Molex Fibre Optic Cable Assemblies FLEXI TRUNK CBL OM3 24F PLN 10m Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Molex Fibre Optic Cable Assemblies FLEXI TRUNK CBL SM 24F PLN 10m Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Molex Sensor Junction Blocks MPIS M12 JunBx TpMnt PNP 4P/4PT 15M SNGL Non-Stocked Lead-Time 9 Weeks
Min.: 5
Mult.: 1

Tripp Lite Fibre Optic Cable Assemblies 10Gb DUPLX MULTIMODE 50/125 OM3LSZH PATCH Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

HARTING Sensor Junction Blocks Sensor Actuator Box M12 ACode 4pin4Ports Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

HARTING Sensor Junction Blocks Sensor Actuator Box M12 ACode 4pin4Ports Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

HARTING Sensor Junction Blocks M12 SensorActuatorBx 4prts5P Pre-assm 10 Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

HARTING Sensor Junction Blocks Sensor Actuator Box M12 ACode 5pin4Ports Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

HARTING Sensor Junction Blocks Sensor Actuator Box M12 ACode 4pin8Ports Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

HARTING Sensor Junction Blocks Sensor Actuator Box M12 ACode 4pin8Ports Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

HARTING Sensor Junction Blocks Sensor Actuator Box M12 ACode 5pin8Ports Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Phoenix Contact Ribbon Cables / IDC Cables FLK 26/EZ-DR/1000/KONFEK Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Phoenix Contact Ribbon Cables / IDC Cables FLK 14/EZ-DR/1000 KONFEK Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

Phoenix Contact Ribbon Cables / IDC Cables FLK 50-PA/EZ-DR/KS/ 1000/YUC Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1
Phoenix Contact Ribbon Cables / IDC Cables FLK 40-PA/EZ-DR/KS/ 1000/YUC Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

Amphenol SINE Systems DC Power Cords ?" Single-ended 3 Position Drop/Branch Cable Assembly, Male, Straight, Black,10 Meter Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

ATOP Fibre Optic Cable Assemblies Fiber Optic Cable 10 Meters Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1

ATOP Fibre Optic Cable Assemblies Fiber Optic Cable 10 Meters Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1

Banner Engineering Sensor Junction Blocks R95 Molded Junction Box with 16 Signals and Cable Homerun; 8 Female 5-pin M12 Ports; 10 Meter Flying Lead Homerun; Dual Signal Ports Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1

Banner Engineering Sensor Junction Blocks R95 Molded Junction Box with 16 PNP Signals and Cable Homerun; 8 Female 5-pin M12 Ports; 10 Meter Flying Lead Homerun; Dual Signal Ports w_ PNP LEDs Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1