|
|
Test Accessories - Other VeriSafe 2.0 AVT Replacement Connector, Network Module RS485
Panduit VS2-AVT-NETCON
- VS2-AVT-NETCON
- Panduit
-
1:
$13.75
-
4Expected 31/8/2026
|
Mouser Part No
644-VS2-AVT-NETCON
|
Panduit
|
Test Accessories - Other VeriSafe 2.0 AVT Replacement Connector, Network Module RS485
|
|
4Expected 31/8/2026
|
|
|
$13.75
|
|
|
$13.26
|
|
|
$12.96
|
|
|
$12.66
|
|
|
View
|
|
|
$12.38
|
|
|
$12.23
|
|
|
$12.09
|
|
|
$11.95
|
|
|
Quote
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Test Accessories - Other pat1mxb.SWITCH,MEMBRANE (With Stainless Steel Subplate)*PAT1M4.0 Fmy
Panduit WT27544B01
- WT27544B01
- Panduit
-
1:
$214.73
-
1Expected 25/8/2026
|
Mouser Part No
644-WT27544B01
|
Panduit
|
Test Accessories - Other pat1mxb.SWITCH,MEMBRANE (With Stainless Steel Subplate)*PAT1M4.0 Fmy
|
|
1Expected 25/8/2026
|
|
|
$214.73
|
|
|
$212.46
|
|
|
$209.33
|
|
|
$206.18
|
|
|
View
|
|
|
Quote
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Component Testers VeriSafe Absence of Voltage Tester- 2 Ft.(0.6m) Cable, 3 Ft. (0.9m) Leads, For Europe
- VS-AVT-C02-L03E
- Panduit
-
1:
$685.68
-
Non-Stocked Lead-Time 12 Weeks
|
Mouser Part No
644-VS-AVT-C02-L03E
|
Panduit
|
Component Testers VeriSafe Absence of Voltage Tester- 2 Ft.(0.6m) Cable, 3 Ft. (0.9m) Leads, For Europe
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Test Accessories - Other Verisafe Replacement AVT System Cable, 4 ft.
- VS-AVT-CABLE-04
- Panduit
-
1:
$89.72
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
644-VS-AVT-CABLE-04
|
Panduit
|
Test Accessories - Other Verisafe Replacement AVT System Cable, 4 ft.
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
|
$89.72
|
|
|
$87.77
|
|
|
$85.26
|
|
|
$83.40
|
|
|
View
|
|
|
$80.96
|
|
|
Quote
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Component Testers VeriSafe 2.0 Absence of Voltage Tester. Includes Three-Phase Battery-powered Indicator Module, 2ft (0.6m) System Cable, and 10ft (3.0m) Sensor Leads
- VS2-AVT-3PB-02
- Panduit
-
Shipping Restricted
|
Mouser Part No
644-VS2-AVT-3PB-02
|
Panduit
|
Component Testers VeriSafe 2.0 Absence of Voltage Tester. Includes Three-Phase Battery-powered Indicator Module, 2ft (0.6m) System Cable, and 10ft (3.0m) Sensor Leads
|
|
|
|
|
|
|
|
|
Component Testers VeriSafe 2.0 Absence of Voltage Tester. Includes Three-Phase Battery-Free Indicator Module, 16ft (4.8m) System Cable, and 10ft (3.0m) Sensor Leads
- VS2-AVT-3PF-16
- Panduit
-
1:
$1,297.29
-
Non-Stocked Lead-Time 7 Weeks
|
Mouser Part No
644-VS2-AVT-3PF-16
|
Panduit
|
Component Testers VeriSafe 2.0 Absence of Voltage Tester. Includes Three-Phase Battery-Free Indicator Module, 16ft (4.8m) System Cable, and 10ft (3.0m) Sensor Leads
|
|
Non-Stocked Lead-Time 7 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 1-5 kVA UPS and EBP, Trip Charge Included
- UINSTL1BH
- Panduit
-
1:
$957.54
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UINSTL1BH
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 1-5 kVA UPS and EBP, Trip Charge Included
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 1-5 kVA UPS and EBP, Additional hours for units are at the same location, same visit
- UINSTL1BHX
- Panduit
-
1:
$447.58
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UINSTL1BHX
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 1-5 kVA UPS and EBP, Additional hours for units are at the same location, same visit
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans UPS Installation Service per unit 1-5 kVA and EBP Per Install (Nonbusiness Hours) - OT Labor included, Trip Charge Included
- UINSTL1SH
- Panduit
-
1:
$1,707.85
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UINSTL1SH
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans UPS Installation Service per unit 1-5 kVA and EBP Per Install (Nonbusiness Hours) - OT Labor included, Trip Charge Included
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Nonbusiness Hours) 1-5 kVA UPS and EBP, Additional hours for units are at the same location, same visit
- UINSTL1SHX
- Panduit
-
1:
$494.21
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UINSTL1SHX
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Nonbusiness Hours) 1-5 kVA UPS and EBP, Additional hours for units are at the same location, same visit
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 6-10 kVA UPS and EBP, Trip Charge Included
- UINSTL2BH
- Panduit
-
1:
$1,406.29
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UINSTL2BH
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 6-10 kVA UPS and EBP, Trip Charge Included
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 6-10 kVA UPS and EBP, Additional hours for units are at the same location, same visit
- UINSTL2BHX
- Panduit
-
1:
$863.78
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UINSTL2BHX
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Business Hours) 6-10 kVA UPS and EBP, Additional hours for units are at the same location, same visit
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans UPS Installation Service per unit 6-10 kVA and EBP Per Install (Nonbusiness Hours) - OT Labor included, Trip Charge Included
- UINSTL2SH
- Panduit
-
1:
$2,619.16
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UINSTL2SH
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans UPS Installation Service per unit 6-10 kVA and EBP Per Install (Nonbusiness Hours) - OT Labor included, Trip Charge Included
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Nonbusiness Hours) 6-10 kVA UPS and EBP, Additional hours for units are at the same location, same visit
- UINSTL2SHX
- Panduit
-
1:
$957.54
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UINSTL2SHX
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans UPS Installation Service Per unit Install (Nonbusiness Hours) 6-10 kVA UPS and EBP, Additional hours for units are at the same location, same visit
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans Standard On-Site service, (48 hour SLA) (2 hour standard) Normal Business Hours
- UONSITEBH
- Panduit
-
1:
$2,040.68
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UONSITEBH
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans Standard On-Site service, (48 hour SLA) (2 hour standard) Normal Business Hours
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans Standard On-Site service, (48 hour SLA) (2 hour standard) Outside Normal Business Hours plus Sunday and Holiday
- UONSITESH
- Panduit
-
1:
$2,702.03
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UONSITESH
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans Standard On-Site service, (48 hour SLA) (2 hour standard) Outside Normal Business Hours plus Sunday and Holiday
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans Annual Preventative Maintenance On-Site UPS and Battery Inspection (2 hour standard)
- UPM-ANNUAL
- Panduit
-
1:
$8,264.09
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UPM-ANNUAL
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans Annual Preventative Maintenance On-Site UPS and Battery Inspection (2 hour standard)
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans Semi-Annual Preventative Maintenance On-Site UPS and Battery Inspection (2 hour standard)
- UPM-SEMIANNUAL
- Panduit
-
1:
$14,705.78
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-UPM-SEMIANNUAL
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans Semi-Annual Preventative Maintenance On-Site UPS and Battery Inspection (2 hour standard)
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans UPS Site Audit/Survey (Up to 1.5 Hours) Including Trip Charge
- USITESURVEY
- Panduit
-
1:
$1,826.14
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-USITESURVEY
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans UPS Site Audit/Survey (Up to 1.5 Hours) Including Trip Charge
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Calibration, Warranties, & Service Plans UPS Site Audit/Survey Additional hours for units are at the same location, same visit
- USITESURVEYX
- Panduit
-
1:
$746.99
-
Non-Stocked Lead-Time 10 Weeks
-
New At Mouser
|
Mouser Part No
644-USITESURVEYX
New At Mouser
|
Panduit
|
Calibration, Warranties, & Service Plans UPS Site Audit/Survey Additional hours for units are at the same location, same visit
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Power Cord, 3-pin, 10A, 2m, IEC320-C13 to GB2099 (Americas)
- C13CORD-B
- Panduit
-
1:
$24.21
-
Non-Stocked
|
Mouser Part No
644-C13CORD-B
|
Panduit
|
AC Power Leads Power Cord, 3-pin, 10A, 2m, IEC320-C13 to GB2099 (Americas)
|
|
Non-Stocked
|
|
|
$24.21
|
|
|
$22.30
|
|
|
$21.50
|
|
|
$20.86
|
|
|
View
|
|
|
$20.52
|
|
|
$20.10
|
|
|
$19.79
|
|
|
Quote
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Power Cord, 3-pin, 10A, 2m, IEC320-C13 to BS1363A (UK)
- C13CORD-G
- Panduit
-
1:
$39.71
-
Non-Stocked
|
Mouser Part No
644-C13CORD-G
|
Panduit
|
AC Power Leads Power Cord, 3-pin, 10A, 2m, IEC320-C13 to BS1363A (UK)
|
|
Non-Stocked
|
|
|
$39.71
|
|
|
$36.90
|
|
|
$35.56
|
|
|
$34.69
|
|
|
View
|
|
|
$34.29
|
|
|
$33.65
|
|
|
Quote
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads Power Cord, 3-pin, 10A, 2m, IEC320-C13 to GB2099 (China)
- C13CORD-I
- Panduit
-
1:
$28.38
-
Non-Stocked
|
Mouser Part No
644-C13CORD-I
|
Panduit
|
AC Power Leads Power Cord, 3-pin, 10A, 2m, IEC320-C13 to GB2099 (China)
|
|
Non-Stocked
|
|
|
$28.38
|
|
|
$26.33
|
|
|
$25.39
|
|
|
$24.63
|
|
|
View
|
|
|
$24.22
|
|
|
$23.73
|
|
|
$23.35
|
|
|
Quote
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Test Accessories - Other VeriSafe Replacement AVT System Cable, 2 ft.
- VS-AVT-CABLE-02
- Panduit
-
1:
$84.74
-
Non-Stocked
|
Mouser Part No
644-VS-AVT-CABLE-02
|
Panduit
|
Test Accessories - Other VeriSafe Replacement AVT System Cable, 2 ft.
|
|
Non-Stocked
|
|
|
$84.74
|
|
|
$84.32
|
|
|
$79.42
|
|
|
$77.37
|
|
|
View
|
|
|
$75.36
|
|
|
Quote
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Test Accessories - Other VeriSafe Replacement AVT System Cable, 16 ft.
- VS-AVT-CABLE-16
- Panduit
-
1:
$116.85
-
Non-Stocked
|
Mouser Part No
644-VS-AVT-CABLE-16
|
Panduit
|
Test Accessories - Other VeriSafe Replacement AVT System Cable, 16 ft.
|
|
Non-Stocked
|
|
|
$116.85
|
|
|
$114.31
|
|
|
$111.03
|
|
|
$104.79
|
|
|
View
|
|
|
$102.86
|
|
|
Quote
|
|
Min.: 1
Mult.: 1
|
|
|