- 40 C Bulk Analogue & Digital IC Development Tools

Results: 1,527
Select Image Part # Mfr. Description Datasheet Availability Pricing (SGD) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Analog Devices / Maxim Integrated Power Management IC Development Tools EVKIT, 0.3% accuracy window voltage monitor Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1



Analog Devices / Maxim Integrated Power Management IC Development Tools EVAL KIT MAX17050 MODELGAUGE M3 FG Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools 3.5V 36V, 2A/3A, Synchronous Buck Converter with 15 A Quiescent Current and Reduced EMI Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools 3.5V 36V, 2A/3A, Synchronous Buck Converter with 15 A Quiescent Current and Reduced EMI Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools Evaluation kit for 1.7A, 60V Synchronous Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools Evaluation Kit for MAX17692 Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools Evaluation Kit for MAX17693 Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools EVKIT for MAX20429 Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools EVkit for Twelve-Channel Factory-Calibra Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Interface Development Tools EV Kit for Reinforced, Fast, Low-Power, Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Interface Development Tools MAX22344-MAX22346 Reinforced, Four-chann Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Interface Development Tools Reinforced Ultra-Low Power Four-Channel Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Interface Development Tools 2-Channel, u-Powered Digital Isolator EV Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Interface Development Tools Evaluates: MAX22163-MAX22166, MAX22563-M Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools Evkit for MAX25210 - ATO707, High Voltag Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Interface Development Tools 3.3V CAN with High FP, CMR, and ESD with Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools EVKit of MAX40200 Current Sense/Ideal Di Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Amplifier IC Development Tools High Precision Current-Sense Amplifier Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Data Conversion IC Development Tools EV KIT for MAX5215, MAX5217, and MAX5217 Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools Eval Kit MAX5961 (0 to 16V, Quad, Hot-Sw Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools Eval Kit MAX6791 (High-Voltage, Micropow Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Amplifier IC Development Tools Eval Kit MAX9943 (High-Voltage, Precisio Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools Evkit for MAXM17536 4.5V to 60V, 4A High Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Analog Devices / Maxim Integrated Power Management IC Development Tools EVkit for 100mA; 21V synchronous buck mi Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

MaxLinear Power Management IC Development Tools Evaluation Kit for XR77103-G1R2 G.hn PMIC, 3-output synchronous buck solution, 1.1V/1.5V/3.3V rails, 4.5V to 14V input, power evaluation Non-Stocked Lead-Time 18 Weeks
Min.: 1
Mult.: 1