Results: 1,155
Select Image Part # Mfr. Description Datasheet Availability Pricing (SGD) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Taiwan Semiconductor Bridge Rectifiers 50ns, 1A, 400V, High Efficient Recovery Bridge Rectifier Non-Stocked Lead-Time 8 Weeks
Min.: 5,000
Mult.: 100

Marktech Optoelectronics UV LEDs 280nm (4 chip) 6868 Flat Lens SMD 350mA Non-Stocked
Min.: 300
Mult.: 300
: 300

E-Switch Tactile Switches Tactile, SPST-NO, Off-(On), Surface Mount, Right Angle Non-Stocked Lead-Time 14 Weeks
Min.: 24,200
Mult.: 550
E-Switch Tactile Switches TACT, 50mA 12VDC, SPST-NO Off-(On), Surface Mount, Right Angle Gull Wing Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1
: 600

E-Switch Tactile Switches Tactile, SPST-NO, Off-(On), Surface Mount, Right Angle Non-Stocked Lead-Time 14 Weeks
Min.: 1,200
Mult.: 600
E-Switch Tactile Switches Tactile, SPST-NO, Off-(On), Through Hole, Right Angle, LED, Blue, IP67 Non-Stocked Lead-Time 13 Weeks
Min.: 1,000
Mult.: 100

E-Switch Tactile Switches Tactile, SPST-NO, Off-(On), Through Hole, Right Angle, LED, Green, IP67 Non-Stocked Lead-Time 13 Weeks
Min.: 1,000
Mult.: 100

E-Switch Tactile Switches Tactile, SPST-NO, Off-(On), Through Hole, Right Angle, LED, Red, IP67 Non-Stocked Lead-Time 13 Weeks
Min.: 1,000
Mult.: 100

E-Switch Tactile Switches Tactile, SPST-NO, Off-(On), Through Hole, Right Angle, LED, Blue, IP67 Non-Stocked Lead-Time 13 Weeks
Min.: 1,000
Mult.: 100

E-Switch Tactile Switches Tactile, SPST-NO, Off-(On), Through Hole, Right Angle, LED, Green, IP67 Non-Stocked Lead-Time 13 Weeks
Min.: 1,000
Mult.: 100

E-Switch Tactile Switches Tactile, SPST-NO, Off-(On), Through Hole, Right Angle, LED, Red, IP67 Non-Stocked Lead-Time 13 Weeks
Min.: 1,000
Mult.: 100

Shindengen Bridge Rectifiers VRM=600 IFSM=50 Non-Stocked
Min.: 1
Mult.: 1
: 1,000

Shindengen Bridge Rectifiers Low Noise Bridge Diode SMD Non-Stocked
Min.: 2,000
Mult.: 2,000
: 2,000

Shindengen Bridge Rectifiers VRM=600 IFSM=50 Non-Stocked
Min.: 1
Mult.: 1

Shindengen Bridge Rectifiers VRM=600 IFSM=50 Non-Stocked
Min.: 1
Mult.: 1

Shindengen Bridge Rectifiers VRM=800 IFSM=30 Non-Stocked
Min.: 1
Mult.: 1

Shindengen Bridge Rectifiers 1.0 Amp 800 Volt Non-Stocked
Min.: 1
Mult.: 1
: 1,000

Comchip Technology Bridge Rectifiers VR=200V, IO=1A Non-Stocked Lead-Time 16 Weeks
Min.: 10,000
Mult.: 50
Comchip Technology Bridge Rectifiers DFS GPP 1A 50V Non-Stocked Lead-Time 16 Weeks
Min.: 12,000
Mult.: 1,000
: 1,000

Comchip Technology Bridge Rectifiers DFS VR=100V,IO=1A Non-Stocked Lead-Time 16 Weeks
Min.: 12,000
Mult.: 1,000
: 1,000

Comchip Technology Bridge Rectifiers DFS VR=200V,IO=1A Non-Stocked Lead-Time 16 Weeks
Min.: 12,000
Mult.: 1,000
: 1,000

Comchip Technology Bridge Rectifiers VR=800V, IO=1A Non-Stocked Lead-Time 16 Weeks
Min.: 10,000
Mult.: 50

Comchip Technology Bridge Rectifiers 1A 8000V DIODE, SMD DFS BRIDGE RECTIFIER Non-Stocked Lead-Time 16 Weeks
Min.: 12,000
Mult.: 1,000
: 1,000

Comchip Technology Bridge Rectifiers DFS GPP 1A 1000V Non-Stocked Lead-Time 16 Weeks
Min.: 12,000
Mult.: 1,000
: 1,000

Comchip Technology Bridge Rectifiers DIODE SMD DFS BRIDGE RECTIFIER 1.5A 50V Non-Stocked Lead-Time 16 Weeks
Min.: 12,000
Mult.: 1,000
: 1,000