Flyback Semiconductors

Types of Semiconductors

Change category view
Results: 1,019
Select Image Part # Mfr. Description Datasheet Availability Pricing (SGD) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Monolithic Power Systems (MPS) Switching Voltage Regulators High-Frequency, Quasi-Resonant Flyback Regulator with Integrated 300m GaN FET Non-Stocked Lead-Time 64 Weeks
Min.: 500
Mult.: 500
: 500
Monolithic Power Systems (MPS) Switching Voltage Regulators High-Frequency, Quasi-Resonant Flyback Regulator with Integrated 300m GaN FET Non-Stocked Lead-Time 57 Weeks
Min.: 5,000
Mult.: 5,000
: 5,000
Monolithic Power Systems (MPS) Switching Voltage Regulators High-Frequency, Quasi-Resonant Flyback Regulator with Integrated 300m GaN FET Non-Stocked Lead-Time 64 Weeks
Min.: 500
Mult.: 500
: 500
Monolithic Power Systems (MPS) Switching Voltage Regulators High-Frequency, Quasi-Resonant Flyback Regulator with Integrated 300m GaN FET Non-Stocked Lead-Time 57 Weeks
Min.: 2,500
Mult.: 2,500
: 2,500
Monolithic Power Systems (MPS) Switching Controllers Primary-Side Regulator with CC/CV Control Non-Stocked Lead-Time 37 Weeks
Min.: 1
Mult.: 1
: 500
Monolithic Power Systems (MPS) Switching Controllers Primary-Side Reg with CC/CV Control Non-Stocked Lead-Time 30 Weeks
Min.: 1
Mult.: 1
: 2,500

Monolithic Power Systems (MPS) Switching Voltage Regulators Primary-side Flyback Regulator Non-Stocked Lead-Time 30 Weeks
Min.: 2,500
Mult.: 2,500
: 2,500

Monolithic Power Systems (MPS) LED Lighting Driver ICs Offline PSR LED Controller Non-Stocked Lead-Time 64 Weeks
Min.: 3,000
Mult.: 3,000
: 3,000

Monolithic Power Systems (MPS) LED Lighting Driver ICs Offline PSR LED Controller w/Dimming Non-Stocked Lead-Time 71 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) LED Lighting Driver ICs Prmry-Side Cntrlld Offline LED Drvr Non-Stocked Lead-Time 30 Weeks
Min.: 2,500
Mult.: 2,500
: 2,500

Monolithic Power Systems (MPS) LED Lighting Driver ICs TRIAC Dimmable Primary Side Control Non-Stocked Lead-Time 50 Weeks
Min.: 2,500
Mult.: 2,500
: 2,500

Monolithic Power Systems (MPS) LED Lighting Driver ICs Primary-Side Control Offline LED Cntrllr Non-Stocked Lead-Time 71 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) LED Lighting Driver ICs Primary-Side Control Offline LED Cntrllr Non-Stocked Lead-Time 64 Weeks
Min.: 3,000
Mult.: 3,000
: 3,000

Monolithic Power Systems (MPS) LED Lighting Driver ICs Single-Stage PFC Flyback Controller0 with Primary-Side Feedback, for LED Drivers Down to 1% Dimming Non-Stocked Lead-Time 57 Weeks
Min.: 1
Mult.: 1
: 500
Monolithic Power Systems (MPS) LED Lighting Driver ICs Pure Sngl Stage LLC LED Current Non-Stocked Lead-Time 30 Weeks
Min.: 1,000
Mult.: 1,000
: 1,000

Monolithic Power Systems (MPS) LED Lighting Driver ICs Pure single stage Flyback 4-string LED driver and system voltage controller Non-Stocked Lead-Time 57 Weeks
Min.: 500
Mult.: 500
: 500

Monolithic Power Systems (MPS) LED Lighting Driver ICs Pure single stage Flyback 4-string LED driver and system voltage controller Non-Stocked Lead-Time 50 Weeks
Min.: 2,500
Mult.: 2,500
: 2,500

Monolithic Power Systems (MPS) LED Lighting Driver ICs Pure single stage Flyback 4-string LED driver and system voltage controller Non-Stocked Lead-Time 57 Weeks
Min.: 500
Mult.: 500
: 500

Monolithic Power Systems (MPS) LED Lighting Driver ICs Pure single stage Flyback 4-string LED driver and system voltage controller Non-Stocked Lead-Time 50 Weeks
Min.: 2,500
Mult.: 2,500
: 2,500

Monolithic Power Systems (MPS) LED Lighting Driver ICs 80V, 4-String LED Driver With AC/DC Feedback Non-Stocked Lead-Time 57 Weeks
Min.: 500
Mult.: 500
: 500

Monolithic Power Systems (MPS) LED Lighting Driver ICs 80V, 4-String LED Driver With AC/DC Feedback Non-Stocked Lead-Time 50 Weeks
Min.: 2,500
Mult.: 2,500
: 2,500

Monolithic Power Systems (MPS) Switching Controllers 420KHz, 8V to 80V Input RangeHigh Efficiency Flyback/Forward Controller Non-Stocked Lead-Time 50 Weeks
Min.: 5,000
Mult.: 5,000
: 5,000

Monolithic Power Systems (MPS) Switching Controllers Fast-Off Intelligent Rectifier Driver Non-Stocked Lead-Time 44 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Switching Controllers Fast Turn-off, Intelligent Rectifier with Very Low Voltage Forward Regulation Non-Stocked Lead-Time 44 Weeks
Min.: 500
Mult.: 500
: 500
Monolithic Power Systems (MPS) Switching Controllers Fast-Off Intelligent Rectifier Driver Non-Stocked Lead-Time 37 Weeks
Min.: 2,500
Mult.: 2,500
: 2,500