Load Switches Semiconductors

Types of Semiconductors

Change category view
Results: 533
Select Image Part # Mfr. Description Datasheet Availability Pricing (SGD) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Torex Semiconductor Power Switch ICs - Power Distribution 1A Output Current Push Button Smart Load Switch Non-Stocked
Min.: 5,000
Mult.: 5,000
: 5,000

Torex Semiconductor Power Switch ICs - Power Distribution 1A Output Current Push Button Smart Load Switch Non-Stocked
Min.: 5,000
Mult.: 5,000
: 5,000

Torex Semiconductor Power Switch ICs - Power Distribution 1A Output Current Push Button Smart Load Switch Non-Stocked
Min.: 5,000
Mult.: 5,000
: 5,000

Torex Semiconductor Power Switch ICs - Power Distribution 1A Output Current Push Button Smart Load Switch Non-Stocked
Min.: 5,000
Mult.: 5,000
: 5,000

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 5.5V,2A Low RDSON Load SwitchWit Prgrm Non-Stocked Lead-Time 64 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 5.5V, 2.4A, Low RDS(ON) Load Switch Non-Stocked Lead-Time 64 Weeks
Min.: 1
Mult.: 1
: 5,000

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 5.5V, 1A, Low RDS(ON) Load Switch Non-Stocked Lead-Time 64 Weeks
Min.: 1
Mult.: 1
: 5,000

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 5.5V,2A Low RDSON Load Switch Non-Stocked Lead-Time 57 Weeks
Min.: 1
Mult.: 1
: 5,000

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 5.5V,7A,Low RDSON Load Switchwith current monitor and NTC comparator Non-Stocked Lead-Time 71 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 5.5V,7A,Low RDSON Load Switchwith current monitor and NTC comparator Non-Stocked Lead-Time 64 Weeks
Min.: 5,000
Mult.: 5,000
: 5,000

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 5.5V,7A Low RDSON Load Switch witPrgrm Non-Stocked Lead-Time 71 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution High-Efficiency,Dual, 2A, 0.5V-5.5V, Low IQ,Load Switch Non-Stocked
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution High-Efficiency,Dual, 3A, 0.5V-5.5V, Low IQ,Load Switch Non-Stocked Lead-Time 64 Weeks
Min.: 5,000
Mult.: 5,000
: 5,000

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution Dual 5.5V,7.5A Programmable Current Low RDSON Load Switch with Output Discharge Function Non-Stocked Lead-Time 64 Weeks
Min.: 1
Mult.: 1
: 5,000

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 5.5V, 0.5A Low RDS(ON) Load Switch with Programmable Current Limit,AEC-Q100 Qualified Non-Stocked Lead-Time 71 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution Industrial Grade. 5.5V,2A Low RDSON Load Switch With Programmable Current Limit Non-Stocked Lead-Time 57 Weeks
Min.: 1
Mult.: 1
: 5,000


Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 5.5V, 7A, Low-RDS(ON) Load Switch Non-Stocked Lead-Time 71 Weeks
Min.: 5,000
Mult.: 5,000
: 5,000


Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 36V, 60mohm Single ChannelSmart High Side Load SwitchAEC-Q100 Qualified Non-Stocked Lead-Time 71 Weeks
Min.: 1
Mult.: 1
: 5,000

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 36V, 60mohm Single ChannelSmart High Side Load SwitchAEC-Q100 Qualified Non-Stocked Lead-Time 78 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Power Switch ICs - Power Distribution 5.5V, 5A, Low-RDS(ON) Load Switch with Configurable Current Limit, AEC-Q100 Qualified Non-Stocked Lead-Time 71 Weeks
Min.: 1
Mult.: 1
: 5,000
Renesas / Dialog SLG59H1016V
Renesas / Dialog Power Switch ICs - Power Distribution 125oC-rated4.8mm sq. power control switch Non-Stocked Lead-Time 12 Weeks
Min.: 3,000
Mult.: 3,000
: 3,000

Renesas / Dialog SLG59H1127V
Renesas / Dialog Power Switch ICs - Power Distribution A 4.8 mm sq. power control switch Non-Stocked Lead-Time 12 Weeks
Min.: 3,000
Mult.: 3,000
: 3,000

Renesas / Dialog SLG59M1440V
Renesas / Dialog Power Switch ICs - Power Distribution 1 mm2 Power Switch with Charge Pump Non-Stocked Lead-Time 12 Weeks
Min.: 8,000
Mult.: 8,000
: 8,000

Renesas / Dialog SLG59M1448V
Renesas / Dialog Power Switch ICs - Power Distribution Ultra-small 17 mOhm 2.5 A Load Switch with Discharge Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
: 3,000

onsemi Power Switch ICs - Power Distribution Advanced Load Management Switch Non-Stocked Lead-Time 53 Weeks