|
|
Routers 802.11b/g/n (Wi-Fi 4) PoE, RJ45
- TAP100000300
- Teltonika
-
500:
$85.49
-
Non-Stocked Lead-Time 8 Weeks
|
Mouser Part No
236-TAP100000300
|
Teltonika
|
Routers 802.11b/g/n (Wi-Fi 4) PoE, RJ45
|
|
Non-Stocked Lead-Time 8 Weeks
|
|
Min.: 500
Mult.: 10
|
|
|
|
|
Routers 802.11b/g/n/ac Wave 2 (Wi-Fi 5) with data transmission rates up to 867 Mbps (Dual Band, MU-MIMO)
- TAP200000500
- Teltonika
-
1:
$140.77
-
Non-Stocked Lead-Time 8 Weeks
|
Mouser Part No
236-TAP200000500
|
Teltonika
|
Routers 802.11b/g/n/ac Wave 2 (Wi-Fi 5) with data transmission rates up to 867 Mbps (Dual Band, MU-MIMO)
|
|
Non-Stocked Lead-Time 8 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
WiFi Modules - 802.11 802.11b/g/n/ac Wave 2 (Wi-Fi 5) with data transmission rates up to 867 Mbps (Dual Band, MU-MIMO)
- TAP20000AC00
- Teltonika
-
1:
$93.30
-
Non-Stocked Lead-Time 7 Weeks
-
New Product
|
Mouser Part No
236-TAP20000AC00
New Product
|
Teltonika
|
WiFi Modules - 802.11 802.11b/g/n/ac Wave 2 (Wi-Fi 5) with data transmission rates up to 867 Mbps (Dual Band, MU-MIMO)
|
|
Non-Stocked Lead-Time 7 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
PLC Controllers CODESYS PLC with IIoT Gateway
- cMT-CTRL01
- Weintek
-
Shipping Restricted
-
New At Mouser
|
Mouser Part No
35-CMT-CTRL01
New At Mouser
|
Weintek
|
PLC Controllers CODESYS PLC with IIoT Gateway
Mouser does not sell this product in your region.
|
|
|
|
|
|
|
|
|
Unmanaged Ethernet Switches 10-port unmanaged PoE switch; 8GE/PSE + 2 100/1000 SFP socket, 24VDC
- IGPS-1082GP-24V
- ORing
-
1:
$1,569.44
-
Non-Stocked Lead-Time 12 Weeks
|
Mouser Part No
354-IGPS-1082GP-24V
|
ORing
|
Unmanaged Ethernet Switches 10-port unmanaged PoE switch; 8GE/PSE + 2 100/1000 SFP socket, 24VDC
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Unmanaged Ethernet Switches 6-port unmanaged PoE switch; 4GE/PSE + 2 100/1000 SFP socket, 24VDC
- IGPS-1042GP-24V
- ORing
-
1:
$1,022.72
-
Non-Stocked Lead-Time 12 Weeks
|
Mouser Part No
354-IGPS1042GP24V
|
ORing
|
Unmanaged Ethernet Switches 6-port unmanaged PoE switch; 4GE/PSE + 2 100/1000 SFP socket, 24VDC
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Managed Ethernet Switches 12-port IEC 62443-4-2 cyber-hardened managed switch; 8GE + 4 100/1000 SFP socket, slim size, non-IEEE 1588
- IGS-9084GP-LA
- ORing
-
1:
$1,512.32
-
Non-Stocked Lead-Time 8 Weeks
|
Mouser Part No
354-IGS-9084GP-LA
|
ORing
|
Managed Ethernet Switches 12-port IEC 62443-4-2 cyber-hardened managed switch; 8GE + 4 100/1000 SFP socket, slim size, non-IEEE 1588
|
|
Non-Stocked Lead-Time 8 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Unmanaged Ethernet Switches 6-port unmanaged switch; 4GE + 2 100/1000 SFP socket, slim type
- IGS-1042GPA
- ORing
-
1:
$504.56
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part No
354-IGS1042GPA
|
ORing
|
Unmanaged Ethernet Switches 6-port unmanaged switch; 4GE + 2 100/1000 SFP socket, slim type
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Unmanaged Ethernet Switches 8FE/PSE unmanaged PoE switch; slim type
- IPS-1080A
- ORing
-
1:
$700.40
-
Non-Stocked Lead-Time 11 Weeks
|
Mouser Part No
354-IPS1080A
|
ORing
|
Unmanaged Ethernet Switches 8FE/PSE unmanaged PoE switch; slim type
|
|
Non-Stocked Lead-Time 11 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Ethernet Modules Ethernet to 3 x Relay + 3 Digital Inputs
- ED-038M
- Brainboxes
-
20:
$232.26
-
Non-Stocked Lead-Time 2 Weeks
|
Mouser Part No
360-ED-038M
|
Brainboxes
|
Ethernet Modules Ethernet to 3 x Relay + 3 Digital Inputs
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 20
Mult.: 1
|
|
|
|
|
Ethernet Modules ETHERNET 8 DIGITAL INPUTS + and 8 digital outputs (Pack of 100 products - no CD, no Manual - Pack cannot be split)
- ED-588-X100M
- Brainboxes
-
1:
$38,171.12
-
Non-Stocked Lead-Time 2 Weeks
|
Mouser Part No
360-ED-588-X100M
|
Brainboxes
|
Ethernet Modules ETHERNET 8 DIGITAL INPUTS + and 8 digital outputs (Pack of 100 products - no CD, no Manual - Pack cannot be split)
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Ethernet Modules ETHERNET 8 DIGITAL INPUTS + and 8 digital outputs (Pack of 50 products 1 CD,1 Manual)
- ED-588-X50M
- Brainboxes
-
1:
$19,085.56
-
Non-Stocked Lead-Time 2 Weeks
|
Mouser Part No
360-ED-588-X50M
|
Brainboxes
|
Ethernet Modules ETHERNET 8 DIGITAL INPUTS + and 8 digital outputs (Pack of 50 products 1 CD,1 Manual)
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Unmanaged Ethernet Switches Industrial 4 port Ethernet switch (Pack of 100 products No CD and no manual)
- SW-504-X100M
- Brainboxes
-
1:
$10,297.92
-
Non-Stocked Lead-Time 2 Weeks
|
Mouser Part No
360-SW-504-X100M
|
Brainboxes
|
Unmanaged Ethernet Switches Industrial 4 port Ethernet switch (Pack of 100 products No CD and no manual)
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Unmanaged Ethernet Switches Industrial 4 port Ethernet switch (Pack of 20 products 1 CD , 1 Manual)
- SW-504-X20M
- Brainboxes
-
1:
$2,059.58
-
Non-Stocked Lead-Time 2 Weeks
|
Mouser Part No
360-SW-504-X20M
|
Brainboxes
|
Unmanaged Ethernet Switches Industrial 4 port Ethernet switch (Pack of 20 products 1 CD , 1 Manual)
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Unmanaged Ethernet Switches Hardened Industrial 5 Port PoE 10/100 Fast Ethernet switch -40F to +158F
- SW-725
- Brainboxes
-
1:
$337.18
-
Non-Stocked Lead-Time 2 Weeks
|
Mouser Part No
360-SW-725
|
Brainboxes
|
Unmanaged Ethernet Switches Hardened Industrial 5 Port PoE 10/100 Fast Ethernet switch -40F to +158F
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Gateways PROFIBUS PA Master to EtherNet/IP / Modbus TCP Linking Device
- A-PAL/B
- ProSoft Technology
-
1:
$5,644.94
-
Non-Stocked Lead-Time 5 Weeks
-
New At Mouser
|
Mouser Part No
39-A-PAL/B
New At Mouser
|
ProSoft Technology
|
Gateways PROFIBUS PA Master to EtherNet/IP / Modbus TCP Linking Device
|
|
Non-Stocked Lead-Time 5 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Gateways EtherNet/IP to Reliance AutoMax DCSNet or Remote I/O
- AN-X3-AMX
- ProSoft Technology
-
1:
$5,227.83
-
Non-Stocked Lead-Time 6 Weeks
-
New At Mouser
|
Mouser Part No
39-AN-X3-AMX
New At Mouser
|
ProSoft Technology
|
Gateways EtherNet/IP to Reliance AutoMax DCSNet or Remote I/O
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Gateways EtherNet/IP to Modbus TCP/IP to OPC UA Server Gateway
- PLX32-EIP-MBTCP-UA
- ProSoft Technology
-
1:
$3,138.30
-
Non-Stocked Lead-Time 3 Weeks
-
New At Mouser
|
Mouser Part No
39-PLX32-EIP-MBTCPUA
New At Mouser
|
ProSoft Technology
|
Gateways EtherNet/IP to Modbus TCP/IP to OPC UA Server Gateway
This product may require additional documentation to export from the United States.
|
|
Non-Stocked Lead-Time 3 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Gateways Modbus TCP/IP Client/Server to PROFINET Device Gateway for dual subnets
- PLX32-MBTCP-PND
- ProSoft Technology
-
1:
$2,442.46
-
Non-Stocked Lead-Time 3 Weeks
-
New At Mouser
|
Mouser Part No
39-PLX32-MBTCP-PND
New At Mouser
|
ProSoft Technology
|
Gateways Modbus TCP/IP Client/Server to PROFINET Device Gateway for dual subnets
|
|
Non-Stocked Lead-Time 3 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Gateways Modbus TCP/IP to PROFINET Controller Gateway
- PLX82-MBTCP-PNC
- ProSoft Technology
-
1:
$3,898.32
-
Non-Stocked Lead-Time 5 Weeks
-
New At Mouser
|
Mouser Part No
39-PLX82-MBTCP-PNC
New At Mouser
|
ProSoft Technology
|
Gateways Modbus TCP/IP to PROFINET Controller Gateway
|
|
Non-Stocked Lead-Time 5 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Vision Sensors acA2000-50gm
- 105713
- Basler
-
1:
$2,391.67
-
Non-Stocked Lead-Time 2 Weeks
|
Mouser Part No
405-105713
|
Basler
|
Vision Sensors acA2000-50gm
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Vision Sensors acA2040-25gc
- 105716
- Basler
-
1:
$3,526.29
-
Non-Stocked Lead-Time 2 Weeks
|
Mouser Part No
405-105716
|
Basler
|
Vision Sensors acA2040-25gc
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Vision Sensors ral4096-24gm
- 105994
- Basler
-
1:
$2,531.54
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
405-105994
|
Basler
|
Vision Sensors ral4096-24gm
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Vision Sensors ral6144-16gm
- 105995
- Basler
-
1:
$3,324.23
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
405-105995
|
Basler
|
Vision Sensors ral6144-16gm
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Vision Sensors ral8192-12gm
- 105996
- Basler
-
1:
$3,572.92
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
405-105996
|
Basler
|
Vision Sensors ral8192-12gm
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|