|
|
Switch Fixings SUPPRESSOR BG less than or equal to 48 V DC
Banner Engineering 11-BGX77-048
- 11-BGX77-048
- Banner Engineering
-
1:
$33.36
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-11-BGX77-048
|
Banner Engineering
|
Switch Fixings SUPPRESSOR BG less than or equal to 48 V DC
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Contact Blocks / Switch Kits AUXILIARY CONTACTS BF 3NO 11-G484-30
Banner Engineering 11-G484-30
- 11-G484-30
- Banner Engineering
-
1:
$63.94
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-11-G484-30
|
Banner Engineering
|
Switch Contact Blocks / Switch Kits AUXILIARY CONTACTS BF 3NO 11-G484-30
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Contact Blocks / Switch Kits
|
|
|
|
|
|
|
|
Switch Fixings ESTOP 8-LM2T-AU115 BTN LEGEND 8-LM2T-AU115 - (EMERGENCY STOP)
Banner Engineering 8-LM2T-AU115
- 8-LM2T-AU115
- Banner Engineering
-
1:
$20.85
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-8-LM2T-AU115
|
Banner Engineering
|
Switch Fixings ESTOP 8-LM2T-AU115 BTN LEGEND 8-LM2T-AU115 - (EMERGENCY STOP)
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings BMHL4G WINDOW SINGLE PACK YEL
Banner Engineering BMHL4G
- BMHL4G
- Banner Engineering
-
1:
$4,488.31
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part No
778-BMHL4G
|
Banner Engineering
|
Switch Fixings BMHL4G WINDOW SINGLE PACK YEL
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings BMHL4GSS HEATED WINDOW YELLOW 4 FT ARRAY
Banner Engineering BMHL4GSS
- BMHL4GSS
- Banner Engineering
-
1:
$5,256.98
-
Non-Stocked Lead-Time 8 Weeks
|
Mouser Part No
778-BMHL4GSS
|
Banner Engineering
|
Switch Fixings BMHL4GSS HEATED WINDOW YELLOW 4 FT ARRAY
|
|
Non-Stocked Lead-Time 8 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings BMHL5G WINDOW SINGLE PACK YEL
Banner Engineering BMHL5G
- BMHL5G
- Banner Engineering
-
1:
$5,302.85
-
Non-Stocked Lead-Time 9 Weeks
|
Mouser Part No
778-BMHL5G
|
Banner Engineering
|
Switch Fixings BMHL5G WINDOW SINGLE PACK YEL
|
|
Non-Stocked Lead-Time 9 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings BMHL6G WINDOW YELLOW
Banner Engineering BMHL6G
- BMHL6G
- Banner Engineering
-
1:
$5,933.91
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part No
778-BMHL6G
|
Banner Engineering
|
Switch Fixings BMHL6G WINDOW YELLOW
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings Surface Mount Dome Housing GEN 2
Banner Engineering BWA-HSG-MGS-003
- BWA-HSG-MGS-003
- Banner Engineering
-
1:
$97.30
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-BWA-HSG-MGS-003
|
Banner Engineering
|
Switch Fixings Surface Mount Dome Housing GEN 2
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings M12 12-Pin Prewired; 1/2-14 in NBSM
Banner Engineering BWA-QD12.5
- BWA-QD12.5
- Banner Engineering
-
1:
$41.70
-
Non-Stocked Lead-Time 3 Weeks
|
Mouser Part No
778-BWA-QD12.5
|
Banner Engineering
|
Switch Fixings M12 12-Pin Prewired; 1/2-14 in NBSM
|
|
Non-Stocked Lead-Time 3 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings 8-pin M12 Prewired; 1/2-14 in NBSM
Banner Engineering BWA-QD8.5
- BWA-QD8.5
- Banner Engineering
-
1:
$29.19
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-BWA-QD8.5
|
Banner Engineering
|
Switch Fixings 8-pin M12 Prewired; 1/2-14 in NBSM
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings Emergency Stop Legend Label (adhesive backed); English - Mexican Spanish; 60 mm OD, 41 mm hole, Use with SSA-EB1 40 mm and SSA-EB2 60 mm Actuators; Qty 10
Banner Engineering ESL-41/60-ENMX-10
- ESL-41/60-ENMX-10
- Banner Engineering
-
1:
$91.46
-
Non-Stocked Lead-Time 4 Weeks
-
New At Mouser
|
Mouser Part No
778-ESL41/60-ENMX-10
New At Mouser
|
Banner Engineering
|
Switch Fixings Emergency Stop Legend Label (adhesive backed); English - Mexican Spanish; 60 mm OD, 41 mm hole, Use with SSA-EB1 40 mm and SSA-EB2 60 mm Actuators; Qty 10
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Cases / Switch Covers EZA-ADE-1 EZS ACCESSORY ACCESS DOOR EMITTER
Banner Engineering EZA-ADE-1
- EZA-ADE-1
- Banner Engineering
-
1:
$26.41
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-ADE-1
|
Banner Engineering
|
Switch Cases / Switch Covers EZA-ADE-1 EZS ACCESSORY ACCESS DOOR EMITTER
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Cases / Switch Covers
|
|
|
|
|
|
|
|
Switch Cases / Switch Covers EZA-ADE-2 EZS ACCESSORY ACCESS DOOR INVERT DISPLAY E
Banner Engineering EZA-ADE-2
- EZA-ADE-2
- Banner Engineering
-
1:
$29.19
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-ADE-2
|
Banner Engineering
|
Switch Cases / Switch Covers EZA-ADE-2 EZS ACCESSORY ACCESS DOOR INVERT DISPLAY E
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Cases / Switch Covers
|
|
|
|
|
|
|
|
Switch Cases / Switch Covers EZA-ADE-4 EZS ACCESSORY INVERT ACCESS DOOR E LOW ESD
Banner Engineering EZA-ADE-4
- EZA-ADE-4
- Banner Engineering
-
1:
$82.01
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-ADE-4
|
Banner Engineering
|
Switch Cases / Switch Covers EZA-ADE-4 EZS ACCESSORY INVERT ACCESS DOOR E LOW ESD
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Cases / Switch Covers
|
|
|
|
|
|
|
|
Switch Cases / Switch Covers EZA-ADR-1 EZ-SCREEN ACCESSORY ACCESS DOOR RECEIVER
Banner Engineering EZA-ADR-1
- EZA-ADR-1
- Banner Engineering
-
1:
$26.41
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-ADR-1
|
Banner Engineering
|
Switch Cases / Switch Covers EZA-ADR-1 EZ-SCREEN ACCESSORY ACCESS DOOR RECEIVER
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Cases / Switch Covers
|
|
|
|
|
|
|
|
Switch Cases / Switch Covers EZA-ADR-4 EZ-SCREEN ACCESSORY INVERT ACCESS DOOR R LOW ESD
Banner Engineering EZA-ADR-4
- EZA-ADR-4
- Banner Engineering
-
1:
$82.01
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-ADR-4
|
Banner Engineering
|
Switch Cases / Switch Covers EZA-ADR-4 EZ-SCREEN ACCESSORY INVERT ACCESS DOOR R LOW ESD
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Cases / Switch Covers
|
|
|
|
|
|
|
|
Switch Fixings EZA-RR-1 EZ SCREEN ACCESSORY REMOTE RESET KEY BOX
Banner Engineering EZA-RR-1
- EZA-RR-1
- Banner Engineering
-
1:
$376.69
-
Non-Stocked Lead-Time 3 Weeks
|
Mouser Part No
778-EZA-RR-1
|
Banner Engineering
|
Switch Fixings EZA-RR-1 EZ SCREEN ACCESSORY REMOTE RESET KEY BOX
|
|
Non-Stocked Lead-Time 3 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings EZA-RTP-1 EZ SCREEN ACCESSORY JUMPER ASSY
Banner Engineering EZA-RTP-1
- EZA-RTP-1
- Banner Engineering
-
1:
$36.14
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-RTP-1
|
Banner Engineering
|
Switch Fixings EZA-RTP-1 EZ SCREEN ACCESSORY JUMPER ASSY
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings EZA-SW-1 EZ SCREEN ACCESSORY SPANNER WRENCH
Banner Engineering EZA-SW-1
- EZA-SW-1
- Banner Engineering
-
1:
$13.90
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-EZA-SW-1
|
Banner Engineering
|
Switch Fixings EZA-SW-1 EZ SCREEN ACCESSORY SPANNER WRENCH
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings iVu Window spare parts kit; Glass Window; includes window, locking clip, screw; and O-ring
Banner Engineering IVUW-G
- IVUW-G
- Banner Engineering
-
1:
$125.10
-
Non-Stocked Lead-Time 6 Weeks
|
Mouser Part No
778-IVUW-G
|
Banner Engineering
|
Switch Fixings iVu Window spare parts kit; Glass Window; includes window, locking clip, screw; and O-ring
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Keylock Switches K50 Key Switch: 3-position; Left maintained; Right momentary; 4 A at 125 V ac/28 V dc, IP40; 1 m 4-pin M12 PVC Pigtail QD
Banner Engineering K50AK2QPMA W/1M
- K50AK2QPMA W/1M
- Banner Engineering
-
1:
$172.36
-
Non-Stocked Lead-Time 6 Weeks
-
New At Mouser
|
Mouser Part No
778-K50AK2QPMAW/1M
New At Mouser
|
Banner Engineering
|
Keylock Switches K50 Key Switch: 3-position; Left maintained; Right momentary; 4 A at 125 V ac/28 V dc, IP40; 1 m 4-pin M12 PVC Pigtail QD
|
|
Non-Stocked Lead-Time 6 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Keylock Switches
|
|
|
|
|
|
|
|
Keylock Switches K80L Series EZ-LIGHT: 1-Color Indicator with Normally Open 3-Position Key Switch; Voltage: 12-30 V dc; Housing: Polycarbonate; IP40; Input: PNP; Colors: Red - Outputs: 2; 1 for Release , 1 for Bypass; 4-pin M12 1 m (39.4 in) PVC Pigtail QD; includes
Banner Engineering K80AK33825QPL52K
- K80AK33825QPL52K
- Banner Engineering
-
1:
$754.77
-
Non-Stocked Lead-Time 5 Weeks
-
New At Mouser
|
Mouser Part No
778-K80AK33825QPL52K
New At Mouser
|
Banner Engineering
|
Keylock Switches K80L Series EZ-LIGHT: 1-Color Indicator with Normally Open 3-Position Key Switch; Voltage: 12-30 V dc; Housing: Polycarbonate; IP40; Input: PNP; Colors: Red - Outputs: 2; 1 for Release , 1 for Bypass; 4-pin M12 1 m (39.4 in) PVC Pigtail QD; includes
|
|
Non-Stocked Lead-Time 5 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Keylock Switches
|
|
SPST
|
|
Base Mount
|
|
|
|
Switch Fixings K50 Key Switch Spare Keys; 5 Pack; A126 Key
Banner Engineering ACC-K50-SPARE A126 KEY 5 KEYS
- ACC-K50-SPARE A126 KEY 5 KEYS
- Banner Engineering
-
1:
$25.02
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-KSPRA126KEY5KEYS
|
Banner Engineering
|
Switch Fixings K50 Key Switch Spare Keys; 5 Pack; A126 Key
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Switch Fixings 2 Replacement Keys; Used With: EZAC boxes and MGA-KSO-1 Key Switch Assembly
Banner Engineering MGA-K-1
- MGA-K-1
- Banner Engineering
-
1:
$70.89
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-MGA-K-1
|
Banner Engineering
|
Switch Fixings 2 Replacement Keys; Used With: EZAC boxes and MGA-KSO-1 Key Switch Assembly
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Switch Hardware
|
|
|
|
|
|
|
|
Keylock Switches Replacement Part for all Light Screen Families; Key Switch only (includes key); Used With: MACHINE- & PERIMETER-GUARD Controllers; Also Used With: Any DIN Control Module
Banner Engineering MGA-KSO-1
- MGA-KSO-1
- Banner Engineering
-
1:
$52.82
-
Non-Stocked Lead-Time 4 Weeks
|
Mouser Part No
778-MGA-KSO-1
|
Banner Engineering
|
Keylock Switches Replacement Part for all Light Screen Families; Key Switch only (includes key); Used With: MACHINE- & PERIMETER-GUARD Controllers; Also Used With: Any DIN Control Module
|
|
Non-Stocked Lead-Time 4 Weeks
|
|
Min.: 1
Mult.: 1
|
|
Keylock Switches
|
|
|
|
|
|